Skip Navigation Signup Help

WICC: Content: How can adaptive management and monitoring be incorporated into riparian revegetation?

Tour the Site:   «-   page 57 of 150  

How can adaptive management and monitoring be incorporated into riparian revegetation?

Baseline information on pre-project conditions (as described above) and ongoing monitoring will be critical in assessing project success. To utilize adaptive management concepts in your project, pre-project planning should include the establishment of success criteria, thorough baseline surveys, a design rationale, and complete restoration design drawings which reflect the project implementation. After project implementation, periodic or event-driven (following a major storm event or other disturbance) monitoring should be conducted to measure progress and assess the need for changes to the restoration design.

Riparian Corridor Revegetation
Frequently Asked Questions Topics:

| What is? | Info to gather | Permits, regulations, agencies | Funding |
Management and monitoring | Similar projects | Learn more |